Part P: which electrical work is notifiable
Part P of the Building Regulations covers electrical safety in dwellings. The practical question it decides is narrow but expensive to get wrong: does this job have to be told to Building Control, and who does the telling?
Notifiable in England
- Installing a new circuit — an EV charger, an electric shower, a garden or outbuilding supply.
- Replacing a consumer unit — always notifiable.
- Additions or alterations in a special location — principally a room containing a bath or shower.
Not notifiable
- Replacing sockets, switches and light fittings like-for-like on an existing circuit.
- Repairs to an existing circuit that do not extend it.
- Adding a socket or lighting point to an existing circuit outside a special location.
Who notifies, and why it matters to you
There are two routes. A registered electrician on a competent person scheme self-certifies and notifies Building Control on your behalf; the compliance certificate follows from the scheme provider. An unregistered electrician cannot — so you must notify Building Control yourself before the work starts and pay their fee.
Check registration on the Registered Competent Person Electrical register, which covers the schemes in one search. Being a good electrician and being registered are different things, and only one of them produces the certificate.
Work that was never notified
It rarely causes a problem until you sell, at which point it is a conveyancing enquiry you cannot answer. The route back is a regularisation application to the local Building Control body: they inspect, require testing, and charge a fee that typically exceeds what notifying properly would have cost. An EICR is useful evidence of condition but it is not a Building Regulations compliance certificate, and a buyer's solicitor will know the difference.
Where this bites in practice
- Consumer unit replacement — always notifiable; the most common missing certificate.
- EV charger installation — a new circuit, so notifiable, plus a separate DNO notification.
- Rewiring — notifiable throughout, and includes a new board.
- Bathroom lighting — a special location, so stricter than the same job elsewhere.
Not sure whether your job is notifiable?
Describe what you are planning. We reply by email with whether it is notifiable under Part P and how notification works.
Your enquiry goes to the publisher of this site, SEO Dons Ltd (company no. 16766013). We reply by email. We are not an electrical contractor and we do not pass your details to anyone, sell them or add you to a marketing list. A phone number is optional.