EV charger grant: who actually qualifies for £500, and who gets nothing

The government's EV charger grants pay up to £500 towards a home chargepoint and run until 31 March 2027. Whether you get one depends on two things: whether you own a house or a flat (or rent), and where you park. If you own and live in a house with a driveway, there is no household grant for you.

Source: gov.uk, Electric vehicle chargepoint grants, updated 1 April 2026. Last checked 30 October 2026.

Check in two questions

Choose both answers to see which grant, if any, applies.

The household and business schemes, kept separate

Five schemes run to 31 March 2027. Four of them matter to a home or a small business in Harlow. Conflating them is the most common error in EV charger marketing.

SchemeWorthWho can claim
Chargepoint grant for renters and flat owners Up to £500 You own and live in a flat, or you rent and live in any residential property. You must have private off-street parking.
Chargepoint grant for households with on-street parking Up to £500 You live in a property you own or rent, have only on-street parking, and are installing a cross-pavement solution, for example a charging gully.
Chargepoint grant for landlords Up to £500 per socket
up to 200 sockets across all sites
Private landlords, registered social housing providers, public-sector organisations, and property management companies acting for a landlord.
Workplace Charging Scheme Up to £500 per socket
up to 40 sockets across all sites
Businesses, charities and public-sector organisations, for staff or fleet use. (State-funded schools have their own scheme at up to £2,000 per socket.)

The household and landlord rates rose from £350 to £500 on 1 April 2026, so any page still quoting £350 as the current figure is out of date. The 40-socket workplace limit is across all your sites, not per site: a company with six depots shares one allowance.

Who still gets nothing

If you own and live in a house or bungalow with off-street parking, neither household grant applies, and that has been the position since the old Homecharge Scheme closed to owner-occupiers of houses in 2022. It is an eligibility rule, not an offer, so shopping around cannot change it. What is worth doing instead:

On-street parking in Harlow: the cross-pavement route

Much of Harlow's new-town housing is terraced (45.3% of homes at the 2021 Census, against 23.0% across England), often with parking in a shared court or on the street rather than a private driveway (ONS Census 2021, TS044). That makes the on-street grant the one most likely to be new to Harlow readers. Three things to know:

You do not claim it: the installer does

For the household grants, the installer applies the grant against your installation invoice, so you pay the reduced figure. That is why the installer's authorisation to install under the scheme matters more than the brand of charger: you cannot buy from anyone, pay in full and reclaim afterwards. Confirm the installer can claim the grant, and that the chargepoint is an eligible model, before you book.

What decides the installation price

FactorEffect
Cable run from board to parking spaceThe biggest variable: a garage beside the meter is cheap; a space 20 m away with a path to cross is not
Consumer unit capacityNo spare way, or an old board, means a new way or a board change first. See consumer unit replacement cost
Main fuse rating and existing loadDecides whether 7.4 kW is available without load management
Earthing arrangementPME (TN-C-S) supplies need an approved solution for outdoor charging
Whether the run crosses a driveway or footwayDucting, depth or a cross-pavement product. See garage and outdoor electrics
The network-operator step people skip. A charger is a new circuit, so it is notifiable under Part P, and separately the installer must notify the distribution network operator, UK Power Networks in Harlow. A single 7.4 kW single-phase unit normally falls under the G98 notify-after-install route; larger installations, multiple chargers or three-phase equipment can need G99 approval first, which takes weeks rather than days.

Load management, and when you need it

A 7.4 kW charger draws about 32 A on its own and an electric shower can take 40 A. Where total demand could exceed what the main fuse allows, the usual answer is a load-managing charger that throttles itself, rather than a supply upgrade. An installer who has not asked what else is on your supply has not sized the job.

Before you book

  1. Use the checker above to see which scheme, if any, you are in.
  2. Confirm the installer can claim that grant and the unit is an eligible chargepoint.
  3. Measure the run from the consumer unit to the parking space, along the actual route.
  4. Photograph the inside of your board: spare ways and age.
  5. Ask which network route applies, G98 or G99.
  6. Confirm the Part P certificate is included.
  7. Check registration on the Registered Competent Person Electrical register. Grant authorisation and competent-person registration are different things, and you want both.

Check the EV charger grant for your home

Tell us whether you own or rent, whether it is a house or a flat, and where you park. Those answers decide the grant. We reply by email.

We reply by email.

Your enquiry goes to the publisher of this site, SEO Dons Ltd (company no. 16766013). We reply by email. We are not an electrical contractor and we do not pass your details to anyone, sell them or add you to a marketing list. A phone number is optional.