EV charger grant: who actually qualifies for £500, and who gets nothing
The government's EV charger grants pay up to £500 towards a home chargepoint and run until 31 March 2027. Whether you get one depends on two things: whether you own a house or a flat (or rent), and where you park. If you own and live in a house with a driveway, there is no household grant for you.
Source: gov.uk, Electric vehicle chargepoint grants, updated 1 April 2026. Last checked 30 October 2026.
Check in two questions
Choose both answers to see which grant, if any, applies.
The household and business schemes, kept separate
Five schemes run to 31 March 2027. Four of them matter to a home or a small business in Harlow. Conflating them is the most common error in EV charger marketing.
| Scheme | Worth | Who can claim |
|---|---|---|
| Chargepoint grant for renters and flat owners | Up to £500 | You own and live in a flat, or you rent and live in any residential property. You must have private off-street parking. |
| Chargepoint grant for households with on-street parking | Up to £500 | You live in a property you own or rent, have only on-street parking, and are installing a cross-pavement solution, for example a charging gully. |
| Chargepoint grant for landlords | Up to £500 per socket up to 200 sockets across all sites | Private landlords, registered social housing providers, public-sector organisations, and property management companies acting for a landlord. |
| Workplace Charging Scheme | Up to £500 per socket up to 40 sockets across all sites | Businesses, charities and public-sector organisations, for staff or fleet use. (State-funded schools have their own scheme at up to £2,000 per socket.) |
The household and landlord rates rose from £350 to £500 on 1 April 2026, so any page still quoting £350 as the current figure is out of date. The 40-socket workplace limit is across all your sites, not per site: a company with six depots shares one allowance.
Who still gets nothing
If you own and live in a house or bungalow with off-street parking, neither household grant applies, and that has been the position since the old Homecharge Scheme closed to owner-occupiers of houses in 2022. It is an eligibility rule, not an offer, so shopping around cannot change it. What is worth doing instead:
- Get more than one price on the installation itself, since the price, not the grant, is your only variable.
- Measure the cable run honestly before anyone prices it. It is the biggest variable and the easiest thing to mis-scope.
- Ask about load management rather than assuming a supply upgrade.
- Look at your tariff. An EV tariff can save more each year than a one-off grant would have.
- If you let a property, the landlord scheme applies to it even though nothing applies to your own house. See landlord EICR duties for the inspection duties that come with letting.
On-street parking in Harlow: the cross-pavement route
Much of Harlow's new-town housing is terraced (45.3% of homes at the 2021 Census, against 23.0% across England), often with parking in a shared court or on the street rather than a private driveway (ONS Census 2021, TS044). That makes the on-street grant the one most likely to be new to Harlow readers. Three things to know:
- A cross-pavement solution is a fixed installation, such as a gully set into the footway that the cable sits in. A cable trailed loose across the pavement is not one.
- It crosses the public highway, so expect to need the highway authority's agreement first. In Harlow that is Essex County Council.
- A shared, unallocated car park is neither private off-street parking nor on-street parking, so neither household grant fits it. The landlord or freeholder may be able to use the landlord scheme instead.
You do not claim it: the installer does
For the household grants, the installer applies the grant against your installation invoice, so you pay the reduced figure. That is why the installer's authorisation to install under the scheme matters more than the brand of charger: you cannot buy from anyone, pay in full and reclaim afterwards. Confirm the installer can claim the grant, and that the chargepoint is an eligible model, before you book.
What decides the installation price
| Factor | Effect |
|---|---|
| Cable run from board to parking space | The biggest variable: a garage beside the meter is cheap; a space 20 m away with a path to cross is not |
| Consumer unit capacity | No spare way, or an old board, means a new way or a board change first. See consumer unit replacement cost |
| Main fuse rating and existing load | Decides whether 7.4 kW is available without load management |
| Earthing arrangement | PME (TN-C-S) supplies need an approved solution for outdoor charging |
| Whether the run crosses a driveway or footway | Ducting, depth or a cross-pavement product. See garage and outdoor electrics |
Load management, and when you need it
A 7.4 kW charger draws about 32 A on its own and an electric shower can take 40 A. Where total demand could exceed what the main fuse allows, the usual answer is a load-managing charger that throttles itself, rather than a supply upgrade. An installer who has not asked what else is on your supply has not sized the job.
Before you book
- Use the checker above to see which scheme, if any, you are in.
- Confirm the installer can claim that grant and the unit is an eligible chargepoint.
- Measure the run from the consumer unit to the parking space, along the actual route.
- Photograph the inside of your board: spare ways and age.
- Ask which network route applies, G98 or G99.
- Confirm the Part P certificate is included.
- Check registration on the Registered Competent Person Electrical register. Grant authorisation and competent-person registration are different things, and you want both.
Check the EV charger grant for your home
Tell us whether you own or rent, whether it is a house or a flat, and where you park. Those answers decide the grant. We reply by email.
Your enquiry goes to the publisher of this site, SEO Dons Ltd (company no. 16766013). We reply by email. We are not an electrical contractor and we do not pass your details to anyone, sell them or add you to a marketing list. A phone number is optional.